You are here: Home / Products / 3-ply panel / 3 Ply Formwork Board Solid Wood Shuttering Panel for Concrete Wall And Column Formwork

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

3 Ply Formwork Board Solid Wood Shuttering Panel for Concrete Wall And Column Formwork

ZEEMO 3 Ply Formwork Board is a solid wood concrete shuttering panel designed for wall and column formwork applications. Manufactured using three cross-bonded wood layers under heat and pressure, this board provides a stable structure for construction formwork systems.

The 3 ply shuttering board is available in spruce, pine or fir wood materials, with standard thicknesses of 21mm and 27mm. Both surfaces are coated with urea-melamine resin, while the panel edges are treated with waterproof paint to help reduce moisture penetration during construction and storage.
Availability:
Quantity:
  • ZM-TP30

  • Zeemo

ZEEMO Construction Formwork Materials

3 Ply Formwork Board for Concrete Shuttering

Cross-bonded solid wood layers, durable coated surfaces and customized panel sizes for concrete wall and column formwork applications.

               Request a Quote            
ZEEMO 3 ply solid wood formwork board for concrete wall and column shuttering

3 Ply Formwork Board Overview

ZEEMO 3 ply formwork board is a solid-wood panel designed for concrete wall and column formwork systems. It is manufactured by bonding three wood layers crosswise under heat and pressure.

The grain direction of the outer layers is arranged at right angles to the middle layer to form a stable panel structure. This three-layer construction makes the board suitable for concrete shuttering applications.

The 3 ply shuttering board is available with coated surfaces on both sides and waterproof edge painting to help protect the wood panel during formwork operations.

  • Three cross-bonded solid wood layers

  • Spruce, pine or fir material options

  • 21 mm and 27 mm thickness options

  • Customized dimensions available

  • Coated surfaces and waterproof edge painting

  • Designed for concrete wall and column shuttering

3 Ply Board Structure and Manufacturing

The cross-bonded wood structure, coated faces and sealed panel edges are designed to support dimensional stability and moisture resistance during concrete formwork use.

Crosswise arrangement of three solid wood layers in a 3 ply formwork board

Three-Layer Structure

The outer and middle wood layers are arranged crosswise and bonded together under heat and pressure to form a solid wood formwork panel.

Coated surface of ZEEMO three-layer concrete shuttering board

Coated Surface

Both faces are coated with urea-melamine resin. The coating is designed to help resist moisture and surface wear during formwork use.

Waterproof painted edges of the three-layer solid wood formwork panel

Edge Sealing

Panel edges are finished with waterproof paint to help reduce moisture penetration through the edges during storage and construction use.

Key Features of ZEEMO 3 Ply Shuttering Board

Moisture Resistance

Coated faces and painted edges help protect the board during concrete formwork operations.

Cross-Bonded Layers

Crosswise bonding of the three wood layers provides a stable panel construction for concrete shuttering applications.

Easy Workability

The solid wood panel can be cut to suit project requirements. Proper edge resealing is recommended after cutting.

Reusable Formwork

Actual reuse depends on handling, concrete release agent, cleaning, storage and site conditions.

3 Ply Formwork Board Technical Specifications

Note: The values below are based on the product information currently provided. Wood moisture content may affect panel weight, dimensions and mechanical properties. Confirm project-specific requirements and technical details before ordering.

Product Specifications

Item Specification
Product 3 Ply Solid Wood Formwork Board
Available Sizes 500 × 2000 mm, 1000 × 2000 mm or customized
Thickness 21 mm, 27 mm or customized
Thickness Tolerance ±0.5 mm
Face / Back Finnish spruce, pine or fir; yellow waterproof painting/coating
Core Material Spruce, pine or fir
Adhesive Dynea phenolic glue (as specified)
Density 500–600 kg/m³
Moisture Content 8%–14%
Water Absorption ≤10% (as provided; test method to be confirmed)
Edge Treatment Waterproof edge painting

Thickness and Weight

Thickness Weight Layers
21 mm 15.75 kg/m² 3
27 mm 20.25 kg/m²

Weight figures are the supplied reference values and may vary with actual moisture content and wood density. Please confirm the actual weight before ordering.

Available Board Formats

Length (mm) Width (mm)
1000 / 1500 / 2000 / 2500 / 3000 500
Other dimensions can be discussed according to project requirements.

Board Format Tolerances

Item Tolerance
Length / Width ±0.5 mm
Perpendicularity ±1.0 mm/m
Straightness of Sheet Edge ±0.2 mm/m

Mechanical Properties

Property Value
Bending Resistance (EN 789) 35 MPa
Elastic Modulus (EN 789) 8.50 (unit to be confirmed)

The elastic modulus value and its measurement unit should be verified against the original test report before publication.

Applications of 3 Ply Formwork Board

ZEEMO 3 ply solid wood formwork board is designed for concrete shuttering applications, including wall and column formwork. Its three-layer wood construction and coated surfaces make it a practical panel option for construction projects.

The appropriate board dimensions and thickness should be selected according to the formwork design, concrete pressure, support spacing and specific project requirements.

Application of solid wood 3 ply formwork board in concrete wall shuttering

Production, Quality Control and Packing

ZEEMO manages formwork material production and supply for construction projects. Production inspection and packing arrangements can be coordinated according to order specifications.

ZEEMO three-layer solid wood formwork board manufacturing process

Board Production

15021b48-48df-4680-9c0a-7440f8bcad38

Quality Inspection

Packing and container loading of 3 ply formwork boards for export

Export Packing

Production Capacity

10 Containers / Day

Minimum Order Quantity

1 × 20' FCL

Typical Lead Time

2–3 Weeks

Payment Terms

T/T or L/C

About Shandong ZEEMO Construction Technology

Shandong ZEEMO Construction Technology Co., Ltd. is engaged in the production and sales of concrete plywood, formwork systems and scaffolding systems. The company focuses on integrating different formwork and scaffolding products to provide practical solutions for construction projects, supported by technical assistance and service.

ZEEMO's product range includes formwork boards, H20 timber beam systems, plastic formwork, steel formwork and scaffolding products.

ZEEMO Vision: Zero-Emission, Efficient, Money-saving, Outstanding Quality.

ZEEMO construction formwork material manufacturing factory
ZEEMO production team and formwork manufacturing workshop

Frequently Asked Questions About 3 Ply Formwork Board

1. What is a 3 ply formwork board?

A 3 ply formwork board is a solid wood concrete shuttering panel made from three wood layers bonded crosswise. It is used in concrete construction applications such as wall and column formwork.

2. What thicknesses are available for 3 ply shuttering boards?

The listed standard thicknesses are 21 mm and 27 mm. Other specifications can be discussed according to project requirements.

3. Can the formwork board size be customized?

Yes. The supplied formats include several lengths with a 500 mm width, and customized dimensions can be discussed before production.

4. How many times can the 3 ply formwork board be reused?

The actual number of reuses depends on handling, stripping, cleaning, release agent, storage and site conditions. Please evaluate reuse performance through project trials rather than relying on a fixed number.

5. What is the minimum order quantity?

The listed minimum order quantity is one 20-foot container (1 × 20' FCL).

6. What is the production lead time?

The indicated lead time is approximately 2–3 weeks after receipt of the deposit or opening of the L/C, subject to order quantity and production schedule.

7. What payment and delivery terms do you accept?

The listed payment methods are T/T and L/C. Delivery terms can include FOB, CFR, CIF and EXW, subject to confirmation in the quotation.

Looking for a 3 Ply Formwork Board Supplier?

Send ZEEMO your required thickness, dimensions and estimated quantity. Our team can help you check the suitable 3 ply solid wood formwork board specification for your concrete construction project.

               Contact ZEEMO on WhatsApp            

SHANDONG ZEEMO CONSTRUCTION TECHNOLOGY CO., LTD.

                   www.zeemoform.com                                |                                    James@zeemoform.com                

 WhatsApp

Previous: 
Next: