You are here: Home / Formwork & Scaffolding Solution / H20 Formwork System / Column Formwork / H20 Timber Beam Column Formwork System for Concrete Construction

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

H20 Timber Beam Column Formwork System for Concrete Construction

Zeemo H20 column Formwork is a versatile column formwork system suitable for columns of various sizes, shapes, and complexity. Its independent components allow flexible assembly, making it ideal for both standard configurations and curved structures. The system ensures quick setup, high reusability, and strong cost-efficiency across different project needs.
Availability:
Quantity:
  • ZM-SP14

  • ZEEMO

H20 Beam System Column Formwork

A modular and reusable concrete column formwork system designed for efficient construction, flexible configuration, and high-quality concrete finishes.

Features & Benefits

01

Flexible Column Dimensions

The modular H20 beam system can be configured for different column sizes and construction requirements, providing a flexible solution for reinforced concrete column construction.

02

High Concrete Pressure Resistance

Engineered H20 timber beams, walers, panels, and steel accessories work together to provide a strong and stable formwork structure during concrete pouring.

03

Modular & Reusable Design

The system is designed for repeated use, helping contractors reduce material consumption, labor requirements, and overall formwork costs.

04

Smooth Concrete Surface

High-quality formwork panels provide a smooth and uniform concrete finish, reducing the need for additional surface treatment after stripping.

05

Easy Assembly & Adjustment

Modular components can be quickly assembled, adjusted, and dismantled on site, improving construction efficiency and reducing installation time.

06

Multiple Formlining Options

The system can be combined with birch plywood, hardwood plywood, poplar plywood, or hollow plastic boards to meet different project requirements.

Applications

✅ Residential Buildings
✅ Commercial Buildings
✅ High-Rise Buildings
✅ Industrial Buildings
✅ Concrete Columns & Piers
✅ Bridge Abutments & Piers
✅ Water Tanks
✅ Basements
✅ Infrastructure Projects
✅ Irregular Concrete Structures

Product Video

Technical Data

Parameter Specification
System Type H20 Beam Column Formwork System
Main Structure H20 Timber Beam, Steel Walers & Steel Accessories
Formwork Material Spruce Wood, H20 Timber Beam, Aluminum Beam & Steel Components
Formwork Weight Approx. 65 kg/m²
Maximum Unit Size Up to 5 × 6 m
Maximum One-Time Casting Height Up to 12 m
Maximum Concrete Bearing Capacity Up to 90 kN/m²
Installation Capacity Approx. 100 m²/day/unit
Recommended Crew 4–6 workers per unit
Formlining Options 18/21 mm Birch Plywood, Hardwood Plywood, Poplar Plywood & Hollow Plastic Board
Panel Size & Shape Customized according to project requirements
Handling Method Tower Crane
Container Loading Approx. 350 m² per 40 HQ container, including accessories

System Advantages

High Efficiency

Quick assembly and dismantling reduce labor time and shorten construction cycles.

♻️

Reusable

Durable components and replaceable panels allow repeated use across projects.

Flexible Configuration

Beams and accessories adapt to different column dimensions and requirements.

Cost Effective

Reusable design reduces long-term formwork costs and material waste.

Professional Finish

High-quality facing materials produce smooth concrete surfaces with minimal post-treatment.

Project Customization

Components can be customized to meet specific project requirements.

Project Cases

Residential Building

Residential Building

Commercial Building

Commercial Building

FAQ

How to get a quotation? +
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: James@zeemoform.com
Phone: +86-181-62094939
What is the payment term? +
By T/T or L/C.
What is the lead time? +
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Custom Formwork Solutions

Designed for Your Project — ZEEMO can provide customized H20 Beam Column Formwork Solutions according to project drawings, column dimensions, casting heights, concrete pressure requirements, and site conditions.

The system can be configured with different H20 timber beams, plywood panels, hollow plastic boards, steel walers, tie rods, clamps, and supporting accessories to create an optimized formwork solution for each project.

H20 Timber Beam Plywood Panel Plastic Formwork Board Steel Waler Tie Rod Formwork Clamp Supporting Accessories

Need a Customized H20 Column Formwork Solution?
Send us your structural drawings, column dimensions, casting height, and project requirements. Our technical team can help develop a suitable H20 beam formwork configuration for your project.

Get a Formwork Solution →
Previous: 
Next: