When Do Basement and Retaining Walls Need Single-Sided Formwork?

Views: 0     Author: Site Editor     Publish Time: 2026-11-25      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

A wall can look straightforward on a structural drawing until you add the excavation boundary. If the outside face sits next to an existing structure, a property line or a waterproofing build-up, there may be no working space for a conventional formwork setup on that face. This is when a contractor should evaluate single-sided formwork.

 

175e3ffaa24fa550201c9ddd583d033e.png

ZEEMO single-sided wall formwork

Identify what makes the wall single-sided

Check whether the constraint is lack of access, a restriction on through-ties, or both. Mark the affected wall segments on the plan. A site may have enough working room for conventional formwork along one elevation and require a different setup along the boundary wall.

In a single-sided arrangement, the formwork is supported from the available side. The support and anchorage arrangement must transfer the forces from fresh concrete into a suitable supporting structure. Have the project’s temporary works engineer review that load path and confirm compatibility with the permanent works.

Published single sided formwork data

Product

Published specification

What to check

ZM-SS29 retaining wall system

2.7 m maximum height per pour

Compare the proposed pour heights with the quoted configuration.

SS-186 wall support system

18 mm film-faced plywood and H20 beams

Confirm facing and support items in the quote.

Illustrative enquiry example. A 20 m wall with a 3.2 m proposed pour has 64 m² of formed face. That pour is 0.5 m above the published ZM-SS29 figure. Ask the project engineer and supplier to review the configuration and pour sequence before pricing.

Information to mark on the drawings

Interface

What to mark

Who confirms it

Access

Clear working width and obstructions

Site team

Waterproofing

Membrane and penetration restrictions

Waterproofing team

Supporting structure

Base details and fixing restrictions

Project temporary works engineer

Resolve three interfaces before requesting a firm price

1. Working side. Mark the usable space for brackets, handling and material access. Show nearby columns, ramps, service trenches and other obstructions.

2. Waterproofing. Identify the membrane, protection layers and any restrictions on penetrations. Ask the structural and waterproofing teams to agree on interfaces before accessories are specified.

3. Supporting structure. Share the available base or slab information, including any restrictions on fixing locations. Confirm who reviews the proposed anchorage and who supplies the required components.

Add a plan, a section through the most restricted location and the intended wall pour sequence. Ask the supplier to state where the proposal depends on project information that still needs confirmation. That gives your estimator a basis for pricing the supply package and recording unresolved site work.

Request a formwork layout proposal. Send ZEEMO FORM the excavation plan, wall elevation, tightest section and waterproofing or fixing restrictions. We can prepare a layout proposal based on your drawings. View the ZEEMO product and submit an enquiry.