You are here: Home / News / Product News / ZEEMO H20 Table Formwork: Complete Guide To H20 Slab Formwork Systems

ZEEMO H20 Table Formwork: Complete Guide To H20 Slab Formwork Systems

Views: 1234     Author: James     Publish Time: 2023-04-26      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

ZEEMO H20 Table Formwork System

Highly efficient and customized tables for large-area slabs.

H20 Table Formwork 1
H20 Table Formwork 2
H20 Table Formwork 3
H20 Table Formwork 4
H20 Table Formwork 5
H20 Table Formwork 6

Technical Specifications

Performance data & dimensions

System Type Table Formwork System
Material H20 timber beam, Plywood, and steel accessories
Standard Shoring Heavy Duty Prop, Tripod and steel accessories
Max. Unit Size 4×6 m
Max Permissible Slab Thickness 1000 mm
Installation Time 200 m²/day/unit (5 people)
Formlining 18 mm  birch plywood, hardwood, and polar plywood; Hollow Plastic Board
Handling Method Trolley/Tower Crane
Load Quantity Around 300 m² per 40 HQ container (with accessories)

Product Overview

ZEEMO Table formwork system is widely used in civil and commercial projects for pouring of slabs. The system is suitable for any ground plan and any floor height.

It features a simple structure and portable way of work, making it especially cost‑effective.

Modular design for quick assembly, lightweight operation reduces labour costs, and high load capacity with proven safety.

78b2e25d-cb66-450d-9d92-04275218fbbd(2)

ZEEMO Table Formwork Features and Benefits

Labor & Time Savings

Large table units (up to 4×6 m) enable rapid setup, stripping, and pre-assembly, while being easily relocated with a trolley or crane to the next casting area.

Optimized Space

Fewer beams create wider, column-free spans, while pre-assembled units enhance on-site safety.

Optional Material Choices

ZEEMO Plywood is available in birch, hardwood, poplar, hollow plastic board or ZEEMO PP hollow board (up to 50 uses). H20 timber beams can be replaced with aluminum for extended lifespan across different projects.

Consistent Surface Finish

Produces smooth, even concrete surfaces with natural depth and subtle stone-like texture, ensuring high-quality fair-faced results.

Strong Adaptability

Tower TST60 for heights up to 20 m, making it suitable for high-rise, super high-rise, and minimal-beam structural projects .

Slab Table Formwork Application

large area floor project; Minimal beam structures; High rise building; Skyscraper; Factory building.   

Installation Step

Quick start guide

cf9864f0-72c5-4f91-b96b-19b2483dd5e3
1

Arrange table heads

Position table formwork support heads according to the design layout.

d9a87cd1-e93a-495e-8efb-02368e68da73
2

Fix the main beam

Set up vertical supports at designed spacing, ensure plumb and stability.

fc0d5b9a-abf0-427c-84a0-d5bd3e16d0d0
3

Fix the secondary beam

Use angle connectors to fasten secondary beams with main beams.

f163d5eb-523f-4b50-b2a6-3a3dab3420c1
4

Lay plywood panels

Place plywood over the H20 beam, fixed by trapping screws.

b65dac3f-6abd-4f03-a4d4-31c7817845c8
5

Set the steel prop

Check overall stability, then proceed with concrete pouring.

Tip: Gaps between table units can be filled with plywood — choose unsupported, edge‑supported, or other configurations per design.

Table Formwork Lifting System

Shifting Trolley

Shifting trolley is designed to save labor and time, it used to transport table formwork from work place to the edge of slab, ready for lift to next storey.

Lifting Fork

Lifting fork is used to lift table formworks up and down or from one floor to another.

Project References

Real‑world applications

Al Maktoum Office Tower

Office Tower

Saudi Arabia

24

SAMANA GOLF VIEWS

Dubai, UAE

35

High‑Rise Residential Project

Abu Dhabi, UAE

Our Services

End‑to‑end support

1

Consultancy

Offer you a general idea about formwork & scaffolding


2

Technical Planning

Customized forming & shoring solution proposal according to your structural drawing by Auto‑cad

3

Logistic

Fast to your site with proper packages & well organized loadings

4

On‑site supervision

Shop drawing, assembly drawing, and even send our supervisor to your site for training and supervision

Frequently Asked Questions

Common inquiries

Q Why choose ZEEMO Table Formwork?
We are a professional manufacturer with over 10 years of experience, offering high quality and competitive prices.                     Why Choose Us? We are a more than 10 years professional manufacturer in formwork with high quality and competitive price.
Q What is the warranty period?
We strictly comply with ISO 9001 and SGS quality management systems. If any quality issue arises within the warranty, we offer refund or replacement.                     Strictly complying with quality management systems of ISO 9001 and SGS. If you have any problems concerning quality, we will offer you a refund or a replacement.
Q What is the delivery time?
In‑stock goods: within 7 working days. Custom orders: within 20 days.                     If inventory goods, we will delivery within 7 working days. For a customized order, within 20 days.
Q Can you provide a solution based on my drawings?
Yes. We generate a complete formwork and accessories plan from your structural drawings, with CAD designs showing installation details and quantities.                     We can make plan of everything needed according to the project's structural drawing in Automated format or blueprint. In the CAD design, it clearly shows how to install every item with exact quantity.

Need a Reliable Table Formwork Solution?

Contact ZEEMO today to get a customized proposal based on your project drawings and requirements.

Get a Formwork Solution →