You are here: Home / Formwork & Scaffolding Solution / Scaffolding / Shoring Tower / ZEEMO Q345 Layher Deck Stage Hot Dipped Galvanized All-round Circular Disc Buckle Plate Wedge Lock Ringlock Scaffolding System

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

ZEEMO Q345 Layher Deck Stage Hot Dipped Galvanized All-round Circular Disc Buckle Plate Wedge Lock Ringlock Scaffolding System

Ringlock Scaffolding system,Scaffolding Ringlock 1.4m Steel Plank,Construction Scaffolding,Scaffold Ringlock,Construction Layher Ringlock Scaffolding Systems For Sale
Availability:
Quantity:
  • ZM-TJA

  • ZEEMO

Product Description

ZEEMO HOT SELL RINGLOCK SCAFFOLDING
Construction Steel Glavanized Ringlock scaffolding is the industry standard for modular scaffolding, offering outstanding durability, simplicity and versatility. Ringlock is the scaffolding of choice worldwide for homes, industrial facilities and construction sites.
The ring lock system saves a lot of assembly and disassembly time and minimizes field costs. Its modular construction minimizes storage space when not in use.

Specification
standard 
length (mm)
tube thickness(mm)
tube diameter(mm)
surface treatment 
3000
3/3.25
48
powder coated/ HDG 
2500
3/3.25
48
powder coated/ HDG
2000
3/3.25
48
powder coated/ HDG
1000
3/3.25
48
powder coated/ HDG
ledger 
1950
3/3.25
48
powder coated/ HDG
1780
3/3.25
48
powder coated/ HDG
1150
3/3.25
48
powder coated/ HDG
diagonal braces 
2411
3
42/48
powder coated/ HDG
2244
3
42/48
powder coated/ HDG
Installation
1.   Put Adjustable Base Jack In Place According to Structure Requirement
2.   Adjust Base Jack to Same Horizontal (Use Jack Nut)
3.   Assembly Ringlock Base Collars On Base Jacks
4.   Connect the Base Collars with ringlock Ledgers
5.   Levelling the Base Collar Ledgers On the Same Horizontal (By Spirit Level)
6.   Erect 1st Layer of Ringlock Standard On the Base Collar
7.   Put All Ledgers on for 1st Layer of Ringlock Standards
8.   Adjust the Ledgers of 1st Layer Ringlock Standard to the Same Horizontal
9.   Fixing 1st Layer Ringlock Standards by Ringlock Diagonal and Horizonta Braces
10.  Put Ringlock Stairs and Planks On11. Erect 2nd Layer Standard and Fixing it By Ringlock Scaffold Ledgers andBraces
11.  Erect More Layers of Ringlock Uprights and Decks4. Floor prop bearing capacity Table

Packing & Delivery
Export package covered with waterproof shrinking film and craft paper, bundle with steel stripes outside or as customer request.
Company Profile
00:00
02:52
Shandong Zeemo Construction Technology Co., Ltd is subordinate to Dongstar Group.
The group was established in the 1990s and has a 30-year development history. lt is acomprehensive industrial group.
The products include coated plywood, formwork system, scaffold and accessories.
Dongstar group is the founding president of china template association. Our intelligent logisticsnetwork will deliver in time and effectively reduce costs.
Intimate service will cover the whole process.Please rest assured to cooperate with us!
CULTURE: We are one family, members care each other, cooperate intimately, we sharingdream, idea and love in family. We holding same duty-- to serve clients .
ENTERRISE RESPONSIBILITY: We cherish clients' trust , oriented to solve the solution forproject Our vision is making the
project Zero Emission, Efficient, Money-saving ,Outstanding.
Certifications
Hot Sell Products
FAQ


Previous: 
Next: