You are here: Home / Formwork & Scaffolding Solution / H20 Formwork System / Column Formwork / H20 Timber Beam Column sFormwork System for Concrete Construction

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

H20 Timber Beam Column sFormwork System for Concrete Construction

Zeemo H20 column Formwork is a versatile column formwork system suitable for columns of various sizes, shapes, and complexity. Its independent components allow flexible assembly, making it ideal for both standard configurations and curved structures. The system ensures quick setup, high reusability, and strong cost-efficiency across different project needs.
Availability:
Quantity:
  • ZM-SP14

  • ZEEMO

ZEEMO H20 Table Formwork System

Highly efficient and customized tables for large-area slabs.

10

Technical Specifications

Performance data & dimensions

System Type Table Formwork System
Material H20 timber beam, Plywood, and steel accessories
Standard Shoring Heavy Duty Prop 
Max. Unit Size 4×6 m
Max Permissible Slab Thickness 1000 mm
Installation Time 200 m²/day/unit (5 people)
Formlining 18 mm  birch plywood, hardwood, and polar plywood; Hollow Plastic Board
Handling Method Trolley/Tower Crane
Load Quantity Around 300 m² per 40 HQ container (with accessories)

Product Video

Product Overview

ZEEMO Table form is widely used in civil projects for pouring of slabs. The system is suitable for any ground plan and any floor height.

It features a simple structure and portable way of work, making it especially cost‑effective.

Modular design for quick assembly, lightweight operation reduces labour costs, and high load capacity with proven safety.

Product sketch of ZEEMO table formwork system

ZEEMO Table Formwork Features and Benefits

Labor & Time Savings

Large table units (up to 4×6 m) enable rapid setup, stripping, and pre-assembly, while being easily relocated with a trolley or crane to the next casting area.

Optimized Space

Fewer beams create wider, column-free spans, while pre-assembled units enhance on-site safety.

Optional Material Choices

TECON-Form Plywood is available in birch, hardwood, poplar, hollow plastic board or TECON-Form Plas-tech (up to 50 uses). H20 timber beams can be replaced with aluminum for extended lifespan across different projects.

Consistent Surface Finish

Produces smooth, even concrete surfaces with natural depth and subtle stone-like texture, ensuring high-quality fair-faced results.

Strong Adaptability

Tower TST60 for heights up to 20 m, making it suitable for high-rise, super high-rise, and minimal-beam structural projects .

Slab Table Formwork Application

large area floor project; Minimal beam structures; High rise building; Skyscraper; Factory building.   

Installation Step

Quick start guide

Step 1
1

Arrange table heads

Position table formwork support heads according to the design layout.

Step 2
2

Install vertical props

Set up vertical supports at designed spacing, ensure plumb and stability.

Step 3
3

Fix primary & secondary beams

Use angle connectors to fasten secondary beams onto primary beams.

Step 4
4

Lay plywood panels

Place plywood over the beam grid; choose infill with or without edge support as required.

Step 5
5

Inspect & pour

Check overall stability, then proceed with concrete pouring.

Tip: Gaps between table units can be filled with plywood — choose unsupported, edge‑supported, or other configurations per design.

Project References

Real‑world applications

Al Maktoum Office Tower

Al Maktoum Office Tower

Dubai, UAE

Standard floor slab pouring with fast cycle times and reduced labour costs.

SAMANA GOLF VIEWS

SAMANA GOLF VIEWS

Dubai, UAE

High‑rise residential complex with system table formwork and loose slab formwork.

High-Rise Residential Project

High‑Rise Residential Project

Abu Dhabi, UAE

Adapted to irregular layouts, enabling efficient slab pouring across multiple floors.

Our Services

End‑to‑end support

1

Consultancy

咨询

Offer you a general idea about formwork & scaffolding

提供总体模板脚手架方案

2

Technical Planning

技术方案预案

Customized forming & shoring solution proposal according to your structural drawing by Auto‑cad

根据您的图纸提供订制化模板和脚手架预案。

3

Logistic

物流配送

Fast to your site with proper packages & well organized loadings

快速送达工地,包装防护,装货规范。

4

On‑site supervision

现场监督

Shop drawing, assembly drawing, and even send our supervisor to your site for training and supervision

我们提供加工图,组装图,甚至可以派员到您的工地实施培训监督。

Frequently Asked Questions

Common inquiries

Q Why choose ZEEMO Table Formwork?
We are a professional manufacturer with over 10 years of experience, offering high quality and competitive prices.                     Why Choose Us? We are a more than 10 years professional manufacturer in formwork with high quality and competitive price.
Q What is the warranty period?
We strictly comply with ISO 9001 and SGS quality management systems. If any quality issue arises within the warranty, we offer refund or replacement.                     Strictly complying with quality management systems of ISO 9001 and SGS. If you have any problems concerning quality, we will offer you a refund or a replacement.
Q What is the delivery time?
In‑stock goods: within 7 working days. Custom orders: within 20 days.                     If inventory goods, we will delivery within 7 working days. For a customized order, within 20 days.
Q Can you provide a solution based on my drawings?
Yes. We generate a complete formwork and accessories plan from your structural drawings, with CAD designs showing installation details and quantities.                     We can make plan of everything needed according to the project's structural drawing in Automated format or blueprint. In the CAD design, it clearly shows how to install every item with exact quantity.

Need a Reliable Table Formwork Solution?

Contact ZEEMO today to get a customized proposal based on your project drawings and requirements.

Get a Formwork Solution →
Previous: 
Next: