| Availability: | |
|---|---|
| Quantity: | |
ZMTF20
ZEEMO
Highly efficient and customizable table formwork for large-area concrete slab construction, high-rise buildings and commercial projects.
Key performance data, dimensions and configuration options for the ZEEMO H20 table formwork system.
| System Type | H20 Table Formwork System |
|---|---|
| Main Materials | H20 timber beams, plywood and steel accessories |
| Standard Shoring | Heavy-duty steel props, tripods and steel accessories |
| Maximum Table Unit Size | Up to 4 × 6 m |
| Maximum Slab Thickness | Up to 1000 mm, subject to engineering design |
| Installation Productivity | Approximately 200 m²/day/unit with 5 workers |
| Formlining Options | 18 mm birch plywood, hardwood plywood, poplar plywood and hollow plastic board |
| Handling Method | Shifting trolley and tower crane |
| Loading Reference | Approximately 300 m² per 40 HQ container with accessories |
See how the H20 table formwork system is assembled, moved and used for concrete slab construction.
ZEEMO H20 Table Formwork System is a reusable slab formwork solution designed for large-area concrete floor construction. It combines H20 timber beams, plywood panels and adjustable steel shoring to create a stable and efficient working platform.
The table formwork system can be pre-assembled into large units and moved between casting areas using a shifting trolley or tower crane. This reduces repetitive manual assembly and helps improve construction efficiency on large projects.
With flexible dimensions and configurable components, the system can be adapted to different floor plans, slab thicknesses and project requirements.
Large table units up to 4 × 6 m can be pre-assembled and quickly relocated to the next casting area, reducing repetitive installation and stripping work.
Pre-assembled slab formwork tables help construction teams cover large floor areas efficiently and maintain a consistent working sequence.
Formlining can be selected from birch plywood, hardwood plywood, poplar plywood or hollow plastic board according to project requirements and expected reuse cycles.
Properly installed plywood formwork can provide a smooth and uniform concrete surface, helping contractors achieve high-quality architectural concrete finishes.
The table formwork system can be configured for different floor plans and building heights. ZMST60 tower solutions can be used for applications requiring support heights up to 20 m, subject to engineering design.
Suitable for large-area slab projects, high-rise buildings, skyscrapers, commercial buildings and factory construction where repetitive floor cycles require efficient formwork.
Basic installation sequence for assembling a ZEEMO table formwork unit.
Position the table formwork support heads according to the approved structural and formwork layout.
Install the main H20 beams and vertical supports at the designed spacing. Check plumbness, alignment and overall stability.
Use suitable angle connectors and accessories to secure the secondary H20 beams to the main beams and create the required support grid.
Place the selected plywood panels over the H20 beam grid and secure them using suitable formwork fasteners.
Adjust the steel props to the required height, check the overall stability and alignment, and complete the necessary inspection before concrete pouring.
The shifting trolley is designed to transport assembled table formwork units from the working area to the edge of the slab, where they can be prepared for lifting to the next floor. This helps reduce manual handling and improves the efficiency of repetitive floor construction.
The lifting fork is used to lift and lower table formwork units and transfer them between floors. It provides an efficient handling solution for multi-storey and high-rise slab construction.
Examples of table formwork applications in high-rise and commercial construction projects.
Saudi Arabia
Dubai, UAE
Abu Dhabi, UAE
From technical planning to delivery and on-site support, ZEEMO provides formwork solutions for different construction requirements.
Provide professional guidance on formwork and scaffolding solutions according to your construction requirements.
Develop customized formwork and shoring proposals based on your structural drawings using CAD technology.
Arrange properly packaged and organized shipments to help ensure efficient delivery to your project site.
Provide shop drawings, assembly drawings and, when required, on-site training and technical supervision.
Common questions about the ZEEMO H20 table formwork system.
ZEEMO provides professional formwork solutions with more than 10 years of manufacturing experience. The H20 table formwork system is designed for efficient slab construction, reusable operation and flexible project configurations.
ZEEMO follows established quality management procedures and provides after-sales support for product quality issues according to the agreed commercial terms and warranty conditions.
Standard in-stock products can normally be delivered within 7 working days, while customized orders may require approximately 20 days. Final delivery time depends on product configuration, order quantity and production schedule.
Yes. ZEEMO can develop a customized formwork and shoring proposal based on your structural drawings. CAD drawings can show the installation arrangement, component configuration and required quantities for the project.
Contact ZEEMO for a customized H20 table formwork and slab shoring proposal based on your project drawings, floor layout and construction requirements.
Get a Formwork Solution →