You are here: Home / Formwork & Scaffolding Solution / H20 Formwork System / Column Formwork / H20 Timber Beam Column Wall Formwork System for High Rise Building Construction

Hot Products

CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

H20 Timber Beam Column Wall Formwork System for High Rise Building Construction

Zeemo H20 column Formwork is a versatile column formwork system suitable for columns of various sizes, shapes, and complexity. Its independent components allow flexible assembly, making it ideal for both standard configurations and curved structures. The system ensures quick setup, high reusability, and strong cost-efficiency across different project needs.
Availability:
Quantity:
  • ZM-SP14

  • ZEEMO

H20 Beam System Wall Column Formwork

A modular and reusable H20 beam formwork system for concrete walls and columns, designed for flexible configuration, efficient installation, high concrete pressure resistance, and smooth concrete finishes.

H20 beam wall and column formwork system for concrete construction

H20 Beam Wall Column Formwork System

The H20 Beam Wall Column Formwork System is a flexible concrete formwork solution for reinforced concrete construction. The system combines H20 timber beams, steel walers, plywood or plastic formlining, and steel accessories to create strong and reusable formwork panels.

Its modular configuration allows contractors to adapt panel dimensions and reinforcement arrangements according to project drawings, concrete pressure, casting height, and site conditions. It can be used for concrete columns, walls, piers, water tanks, basements, bridge structures, and other reinforced concrete applications.

Features & Benefits

01

Flexible Column Dimensions

The modular H20 beam system can be configured for different column sizes and construction requirements, providing a flexible solution for reinforced concrete column construction.

02

High Concrete Pressure Resistance

H20 timber beams, steel walers, formwork panels, and steel accessories work together to provide a strong and stable structure during concrete pouring.

03

Modular & Reusable Design

The reusable design helps contractors reduce material consumption and improve formwork efficiency across multiple concrete casting cycles.

04

Smooth Concrete Surface

High-quality formlining options can produce a smooth and uniform concrete surface, helping reduce the need for additional finishing work after stripping.

05

Easy Assembly & Adjustment

Modular components can be assembled, adjusted, and dismantled efficiently on site, helping improve construction productivity and reduce installation time.

06

Multiple Formlining Options

The system can be combined with birch plywood, hardwood plywood, poplar plywood, or hollow plastic boards according to different project requirements.

Technical Data

Parameter Specification
System Type H20 Beam Column Formwork System
Main Structure H20 Timber Beam, Steel Walers & Steel Accessories
Formwork Material Birch Wood, H20 Timber Beam, Aluminum Beam & Steel Components
Formwork Weight Approx. 65 kg/m²
Maximum Unit Size Up to 5 × 6 m
Maximum One-Time Casting Height Up to 12 m
Maximum Concrete Bearing Capacity Up to 90 kN/m²
Installation Capacity Approx. 100 m²/day/unit
Recommended Crew 4–6 workers per unit
Formlining Options 18 mm Birch Plywood, Hardwood Plywood, Poplar Plywood & Hollow Plastic Board
Panel Size & Shape Customized according to project requirements
Handling Method Tower Crane
Container Loading Approx. 350 m² per 40 HQ container, including accessories

Applications

Residential Buildings
Commercial Buildings
High-Rise Buildings
Industrial Buildings
Concrete Columns & Piers
Bridge Abutments & Piers
Water Tanks
Basements
Infrastructure Projects
Irregular Concrete Structures

Wall Column Formwork 3D Assembly Tutorial

Watch the 3D assembly tutorial to understand the basic configuration and installation of the H20 beam formwork system.

H20 Beam Formwork Project Cases

H20 beam formwork used for residential building construction

Residential Building

H20 beam formwork used for commercial building construction

Commercial Building

Frequently Asked Questions

How can I get a quotation for H20 beam formwork?

You can send us your material list to request a quotation. You can also provide structural drawings, column dimensions, casting height, and project information so our technical team can prepare a suitable formwork proposal.

What payment terms are available?

We accept T/T and L/C payment terms, subject to the specific order and commercial agreement.

What is the lead time?

For climbing formwork, self-climbing platforms, and plastic formwork, stock may be available in our warehouse. Loading preparation is generally within 10 to 15 days.

For H20 timber beams, the typical lead time is approximately 15 to 25 days.

For other formwork systems, the typical lead time is approximately 30 to 45 days. Please contact us with your required quantity and product specifications for an accurate delivery schedule.

Custom H20 Beam Formwork Solutions

ZEEMO provides customized H20 beam wall and column formwork solutions according to project drawings, column dimensions, casting heights, concrete pressure requirements, and site conditions.

Need a Customized H20 Column Formwork Solution?
           Send us your structural drawings, column dimensions, casting height, and project requirements. Our technical team can help develop a suitable H20 beam formwork configuration for your project.

           Get a Formwork Solution →        

   Contact ZEEMO on WhatsApp

Previous: 
Next: