Availability: | |
---|---|
Quantity: | |
H20
ZEEMO
it can be the table formwork system/ slab concrete pouring formwork system matching with
plywood shuttering and the vertical support( steel prop);
it also can be the wall formwork system matching with plywood shuttering, push pull prop, tie rod
and other accessories.
H20 Size | Height 200mm, Width 80mm |
Available Lenght(m) | 1.5, 1.9, 2.45, 2.75, 2.9, 3.0, 3.3, 3.6, 3.9, 4.5, 4.9, 5.9, etc |
Flange | North Europe solid wood spruce ,width 80mm thickness 40mm |
Web | Plywood 27mm * 150mm |
Glue | WBP glue |
Weight | 4.5 kg/m |
Moisture Conten | 12% ex workshop |
Package | Pallet , 105 pcs / pallet |
it can be the table formwork system/ slab concrete pouring formwork system matching with
plywood shuttering and the vertical support( steel prop);
it also can be the wall formwork system matching with plywood shuttering, push pull prop, tie rod
and other accessories.
H20 Size | Height 200mm, Width 80mm |
Available Lenght(m) | 1.5, 1.9, 2.45, 2.75, 2.9, 3.0, 3.3, 3.6, 3.9, 4.5, 4.9, 5.9, etc |
Flange | North Europe solid wood spruce ,width 80mm thickness 40mm |
Web | Plywood 27mm * 150mm |
Glue | WBP glue |
Weight | 4.5 kg/m |
Moisture Conten | 12% ex workshop |
Package | Pallet , 105 pcs / pallet |